top of page
Writer's pictureMET GROUP MEDIA

MET Group are Future-Proofing Electrical Systems to the Tech Infrastructure at Proximity Data Centre Milton Keynes for CBRE.



MET Group recently carried out an Energised Inspection to the Proximity Data Centre in Milton Keynes for our valued client CBRE.


The Importance of energised inspections and trend analysis will enhance safety & reliability in the tech infrastructure at this site.


The data will be compared to over 350000 files within the MET Group library as well as being assessed by MET Group engineers who have been assessing sound signatures since 2006 to detect any anomalies within the electrical distribution, keeping our client ahead of any critical power losses.

21 views0 comments

Comments


bottom of page